Skip to the content

Third party verification and geometrical control

Terratec will perform independent geometrical control of tolerance critical equipment on behalf of system suppliers or owners of platforms, rigs, vessels, etc. Typically, this can be a random control during pre-fabrication or a third party verification of a product before deliverance. Documentation and reports will always be in accordance to specified tolerances and standards (ISO, NORSOK, GPS etc.)

There are multiple examples which will show you how a third party control has proved to be cost efficient for the client.